Coir log
Bank toes, slope breaks and sediment control
View detailsCoir logs, also called coir fibre rolls or coir rolls, are coir fibre packed tight inside a tube of coir netting. Staked along the toe of a bank, a shoreline or a slope break, they take the force of waves and flowing water before it reaches the soil behind them.
Sediment settles against the log and plants root into the fibre, so the edge grows stronger over time. Each log is made to the project, with diameter, length and fill density matched to the water and the bank.
Takes the force of waves and flow before it reaches the bank.
Silt settles against the log, building up the toe of the bank.
Flexible enough to follow curves and changes in level.
Vegetation roots into the fibre and binds the edge.
Laid in a shallow trench and secured with stakes, without heavy machinery.
Breaks down as roots take over the job. No plastic left behind.
Standard coir log sizes. Every log is built to the project; these are the common starting points.
| Property | 30 cm | 40 cm | 50 cm |
|---|---|---|---|
| Nominal diameter | 30 cm (12″) | 40 cm (16″) | 50 cm (20″) |
| Lengths | 3 to 6 m; other lengths to project | ||
| Fill | 100% coir fibre; standard or high-density fill | ||
| Netting | Coir twine netting | ||
| Planting | Plain, or pre-planted where import rules allow | ||
| Packing | Labelled by size and lot number | ||
We sample each production lot and send it to an independent laboratory. These are the properties measured, the method used, and what each one tells you. The report carries the lot number printed on your labels and travels with the shipment.
The Coir Board’s research institute and coir geotextile laboratory, set up to test to ASTM methods and recognised by BIS for coir bhoovastra work.
Independent textile and geosynthetics laboratories accredited by India’s National Accreditation Board for Testing and Calibration Laboratories.
Inspection and sampling by an agency you appoint before the container is sealed.
| Property tested | Method | What it tells you |
|---|---|---|
| Diameter and length | Measured per lot | Logs match the size ordered |
| Weight per metre and fill density | Measured per lot | Firmness of the fill, set to the water conditions |
| Netting mesh size | IS 15868 | Netting holds the fill and lets roots through |
| Netting yarn breaking load | Yarn tensile test | Strength of the netting that holds the log together |
| Moisture content | Oven-dry method | Fibre is shipped dry and stable for transit |
Hard engineering stops water by force. Coir logs absorb it and let plants take over the job.
| Property | Coir log | Rock riprap | Gabions |
|---|---|---|---|
| Material | Coir fibre in coir netting | Quarried rock | Wire baskets filled with rock |
| Installation | By hand, staked in place | Heavy machinery | Machinery, wire work |
| Vegetation | Plants root into the fibre | Little or none | Limited unless soil-filled |
| Edge habitat | Natural, soft shoreline | Hard edge | Hard edge |
| Lifespan | 2–5 years, then plants hold the bank | Permanent | Decades; wire can corrode |
| Best for | Low to moderate energy banks being revegetated | High-energy, permanent protection | High-energy, structural walls |
Standard practice for this product. Your project drawings and local specifications always take priority.
Excavate a shallow trench along the bank toe so the log sits partly below the bed and water cannot run underneath.
Place logs tight against each other along the line and lace the joints together with twine.
Drive hardwood stakes on both sides at regular intervals and tie across the top of the log with rope or twine.
Backfill behind the log with soil, then set plant plugs or seed into the fibre and the bank above.
Coir logs work wherever water meets soil and the edge needs to hold while plants establish.
Loose coir fibre, packed tight into a tube of coir netting. The fill density is set by the job: firmer for flowing water, lighter where planting is the priority.
Along riverbank and channel toes, lake and pond shorelines, wetland edges and slope breaks, wherever the edge of the soil needs protection from water.
Usually laid in a shallow trench along the bank and secured with stakes driven through or beside the log. No heavy machinery is needed.
Logs are made to each project. Send us the length of bank, the water conditions and any drawings, and we will confirm diameter, length and fill density before quoting.
Plugs or seed are set into the fibre, where roots grow through the netting and into the bank. Pre-planted logs arrive with vegetation already started; availability depends on destination and plant import rules.
Every order is planned personally, from choosing the grade to comparing ports and inland routes for the lowest landed cost. If you would rather talk your project through than fill in a form, reach out directly.
Product details, grades, packing and the Vazdor Group company profile, sent to your inbox.
Share the application, quantity and destination port. We reply within one working day.